Wheelchair Accessible Bathrooms for London Homes

Level-access wet rooms and adapted bathrooms planned around the person using them, their wheelchair and the way they transfer.

Excellent
Wheelchair Accessible Bathroom

Wheelchair Accessible Bathroom

  • A written price before work starts
  • One team from plan to handover
  • Working across London

Families value a bathroom that fits the way they move

Client reviews

Excellent
  • “Clear valuations”

    Monthly valuations were measured properly and explained line by line. Having the numbers checked independently made the whole job calmer.

    Developer, refurbishment

  • “Straight answers”

    Every question about the basement got a straight answer, including the ones about party walls and drainage we had not thought to ask.

    Homeowner, basement

  • “Kitchen fitted properly”

    Units level, worktop joints you can barely see, and the old boxing moved so the extractor could run straight out. Very happy with it.

    Homeowner, kitchen

  • “Cost plan we could trust”

    The cost plan broke every stage down so we knew what the extension would need before a single quote came in. No surprises at the final account.

    Homeowner, extension

  • “Tidy and well organised”

    The loft went in with the house still lived in. Dust sheets every day, the stairs finished before the steels were boxed in, and clear updates each Friday.

    Homeowner, loft conversion

  • “Thought about every detail”

    The wet room was planned around my mother’s wheelchair, from the door width to where the rails sit. She can use it on her own now.

    Family member, accessible bathroom

An accessible bathroom works or fails on details measured in centimetres: the clear width of a door, the height of a basin, the side a wheelchair user transfers from, the reach to a flush plate. Home Care Construction builds wheelchair accessible bathroom projects in London homes, starting from how the person actually moves rather than from a standard layout.

Most of these rooms end up as a level-access wet room, with a floor laid to falls towards a drain, tanked floor and walls, and space to turn a chair. Others keep a bath with a transfer seat, or add a ceiling track hoist for a carer. We work from the occupational therapist’s recommendations where they exist, and from careful measurements of the user and the wheelchair where they do not.

The work often reaches beyond the bathroom. Doorways are widened, thresholds levelled, and sometimes a ground floor room becomes a bedroom and bathroom pair. Where the house has no suitable room downstairs, a single storey extension can provide one. These home adaptations are planned as one job so the route from bed to shower is step-free end to end.

Wheelchair Accessible Bathroom Design at Home

Designing for a wheelchair user starts with measurements of the person and the chair, not the room. We record the chair’s width, length and turning behaviour, the seat height, whether the user transfers independently or with help, and from which side. A left-hand and a right-hand transfer need the toilet in different positions, and getting that wrong makes a new room hard to use.

Approved Document M and BS 8300 give reference figures for turning space, clear door widths, rail positions and fitting heights. We use them as the starting point, then adjust for the individual. A user with limited grip needs lever taps and a large flush plate within reach; a user with sight loss needs strong colour contrast between walls, floor, rails and sanitaryware.

The room itself often has to change. A small London bathroom may be joined with the separate WC or airing cupboard next to it, or moved to a larger room altogether. We draw the layout with the turning circle and transfer space marked on plan, so everyone can see how the room will be used before a wall comes down.

Level-Access Wet Rooms and Drainage

A level-access floor has no step, lip or tray edge between the bathroom and the shower area. Water is managed by falls instead: the floor slopes gently towards a drain, and the whole room is waterproofed with a tanking system beneath the finish.

How that is achieved depends on the floor. On a suspended timber floor, common in Victorian and Edwardian houses, a sunken wet room former is set between the joists to create the falls without raising the room above the landing, with joists strengthened or re-supported where the engineer requires. On a concrete ground floor, the screed is broken out and relaid to falls, with the drain body set into the slab. Either way, the bathroom floor should meet the hall or landing at the same level.

  • Linear drains along a wall, allowing falls in one direction and flatter areas for a chair
  • Slip-resistant sheet vinyl or tiles rated for wet barefoot use
  • Tanking membranes lapped up the walls and sealed at every junction
  • Waste routes checked for fall to the stack, with a pump where gravity will not work

Step-Free and Wheelchair-Accessible Features

Once the floor is level, the fittings decide whether the room works day to day.

  • Turning space: a clear area, usually planned around a 1500mm turning circle, kept free of the basin and toilet
  • Doorways: widened openings with a new lintel, and outward-opening or sliding doors so a fall inside cannot block the way in
  • Rails: grab rails and hinged drop-down rails fixed into timber backing or solid masonry, placed for the user’s transfer
  • Basin: a shallow basin with knee clearance underneath, set at a height the user can reach from the chair
  • Toilet: a raised pan with transfer space alongside, or a wash-and-dry toilet for independent use
  • Shower: a thermostatic valve to limit water temperature, a fold-down seat and a riser rail with the handset within reach

Light switches, controls and the mirror are positioned for seated use, and a pull-cord alarm can be wired in if the household wants one. Timber backing is fitted across wide areas of wall before tiling, so rails can be added or moved later as needs change without disturbing the waterproofing.

Changing Places Style Features for Home

Changing Places toilets in public buildings are designed for people who need a hoist, a changing bench and room for one or two carers. Some families need the same provision at home, and the principles carry over well to a domestic wet room.

A ceiling track hoist is the biggest item. The track is fixed to the structure above, so the joists are checked by an engineer and often strengthened or supplemented with a steel or timber frame. Where the track runs from bedroom to bathroom, the door head is raised or a gap formed so the track continues without a break.

A height-adjustable changing bench, wall-mounted or free-standing, needs a clear wall, a power supply and space for carers on at least one side. A peninsular toilet, set out from the wall, allows assistance from both sides.

All of this takes floor area. Where the existing bathroom cannot hold it, we look at combining rooms or using a ground floor room, and we coordinate with the equipment supplier so the building work and the hoist or bench fit together first time.

Bright finished kitchen with an island

Assessments, Occupational Therapist Input and Planning

An occupational therapist’s assessment is often the most useful document at the start of an accessible bathroom project. It records what the user can do now, how their needs may change, and which equipment is recommended. We build to that assessment and raise questions early if the recommended layout conflicts with the structure of the house.

Where there is no assessment, we carry out a detailed visit and talk through daily routines with the household: who helps with bathing, which transfers are used, and whether a hoist may be needed later. Planning for likely future needs, such as reinforcing ceiling joists for a hoist that is not fitted yet, is far simpler than opening up a finished ceiling in a few years.

Most accessible bathroom work inside an existing house does not need planning permission, though flats need freeholder or landlord consent and listed buildings need listed building consent. Building Regulations apply to new drainage, electrics, ventilation and any structural change, and we manage the building control application and inspections.

Stairlift Installations and Wider Home Adaptations

A first floor bathroom is only accessible if the user can reach it. Where a stairlift or through-floor lift is the answer, the equipment is supplied and fitted by a specialist manufacturer, and our building work prepares the house for it: a fused spur in the right place, a clear stair with handrails repositioned, and for a through-floor lift, a trimmed opening in the floor with the joists re-supported and fire separation kept intact.

Other home adaptations often run alongside the bathroom work:

  • Widening internal doorways and removing raised thresholds
  • Ramps or level landings at the front and back doors
  • Converting a ground floor reception room into a bedroom
  • Lowering switches and sockets for seated use
  • Moving the bathroom down to the ground floor altogether

Planning these together means the route through the house is checked as a whole, from the front door to the bed to the shower, and nothing is left with a single step that undoes the rest of the work.

Living in the Home During the Work

Many accessible bathroom projects are carried out for someone who cannot easily move out, so the work is planned around their care. Before starting, we agree how the household will wash and use the toilet while the bathroom is out of action: a second toilet kept working, a temporary commode, or arrangements with family or respite care for the heaviest days.

Dust screens and zipped doors seal the work area, floors along the route are protected, and tools and materials are kept clear of the paths carers and the user need. Where carers visit at fixed times, deliveries and noisy work are scheduled around those visits.

Water and power are isolated for as short a time as possible and restored at the end of each day where the job allows. The room is handed over only when the tanking has been tested, the floor has cured, the rails have been load-checked and the user has tried the layout, so the first real use of the finished room is a safe one.

How it works

How an accessible bathroom is planned and built

Four stages built around the person who will use the room every day.

  1. Bright finished interior after building work

    Assess and measure

    We visit the home, read any occupational therapist report, and measure the user’s wheelchair, reach and transfer. The floor construction, drainage routes and the joists above are checked at the same visit.

  2. House under construction with new block walls

    Draw the layout

    A plan shows turning space, transfer zones, rail positions and fitting heights, referenced to Approved Document M and BS 8300 and adjusted for the individual. Changes are made on paper before any work starts.

  3. London terraced houses with building work under way

    Strip and rebuild

    The old bathroom is stripped out, doorways are widened and the floor is rebuilt to falls. Drainage, tanking, electrics and wall backing for rails all go in before any tiles or sheet flooring are laid.

  4. Plans and cost figures being reviewed at a desk

    Fit and test together

    Sanitaryware, rails, seat and shower are fitted and tested. The user tries each transfer and reach in the finished room, and any small adjustment is made before we hand the room over.

Quick Quote Online

Plan a bathroom built around one person

Tell us who will use the room and how they move, and we will come back with a Quick Quote for the adaptation.

Quick Quote Online

Areas covered

Accessible bathrooms across London

Adapting a bathroom depends heavily on the building around it. Narrow Victorian terraces in Archway and Brixton often have the bathroom in the back addition, up a half-landing, which can mean moving it to the ground floor to make it step-free. Larger Edwardian houses in Fulham and Chiswick tend to have roomier first floor bathrooms with timber floors that suit a sunken wet room former. Purpose-built flats around Canary Wharf usually sit on concrete slabs, where falls are formed in the screed and freeholder consent comes first. Each job is planned around the structure of that particular home.

  • London
  • City of Westminster
  • Islington
  • Chelsea
  • Battersea
  • Holloway
  • Brixton
  • Peckham
  • Fulham
  • Archway
  • Shepherds Bush
  • Kilburn
  • Canary Wharf
  • Stamford Hill
  • Willesden
  • Cricklewood
  • Putney
  • Greenwich
  • Streatham
  • Stratford

Plus 61 more towns listed on the areas we cover page.

FAQ

Wheelchair Accessible Bathroom: questions people ask first

Wheelchair Accessible Bathroom
What is the difference between a wet room and an accessible bathroom?

A wet room is a waterproofed room with a level shower area and a floor laid to a drain. An accessible bathroom goes further, adding turning space for a wheelchair, wider doorways, rails placed for the user’s transfers, a basin with knee clearance and controls within seated reach. Most accessible bathrooms are wet rooms, but a wet room on its own is not always accessible.

Can a level-access shower be fitted on an upstairs timber floor?

Usually, yes. A sunken former is set between the joists so the shower area can fall to the drain without a step. The joists may need strengthening or re-supporting, depending on their size and the engineer’s check. The waste route to the stack also needs enough fall, or a pump is added to lift the water.

Do I need an occupational therapist assessment before starting?

It is not a legal requirement, but an OT assessment is valuable, especially where needs may change or a hoist is being considered. It records the user’s abilities and the recommended equipment, which gives the design a clear basis. Without one, we carry out a detailed measure of the user and chair and talk through daily routines with the household.

How wide should a bathroom door be for a wheelchair?

It depends on the chair and the approach. Approved Document M and BS 8300 set out clear opening widths for different approach directions, with wider openings where the user has to turn in a narrow corridor. We measure the chair and the route, then size the opening and fit a new lintel. Sliding or outward-opening doors keep the room clear inside.

Can a ceiling hoist be added to the bathroom later?

Yes, if the ceiling is prepared. Fitting timber or steel support above the ceiling during the bathroom build, and recording its position on a drawing, makes a later hoist installation quick and clean. Without that preparation, the finished ceiling may need opening up and the joists strengthening before a track can be fixed.

Quick Quote Online

Request an accessible bathroom Quick Quote

Tell us about the user, the current bathroom and the layout of the home, and we will reply with a Quick Quote for the adaptation work.

Excellent
  • A written price before any work starts
  • Cost planning and building from one team