info@hccconstruction.co.ukQuantity surveying and building across London
Home CareConstruction

Whole-house work

Home Renovation and Refurbishment in London

Rewiring, replastering, new heating, new kitchens and bathrooms, all sequenced as one job. We renovate and refurbish London houses and flats, occupied or empty.

Excellent
Renovation & Refurbishment

Renovation & Refurbishment

  • A written price before work starts
  • One team from plan to handover
  • Working across London

Renovation clients value a clear programme and one point of contact

Client reviews

Excellent
  • “Clear valuations”

    Monthly valuations were measured properly and explained line by line. Having the numbers checked independently made the whole job calmer.

    Developer, refurbishment

  • “Straight answers”

    Every question about the basement got a straight answer, including the ones about party walls and drainage we had not thought to ask.

    Homeowner, basement

  • “Kitchen fitted properly”

    Units level, worktop joints you can barely see, and the old boxing moved so the extractor could run straight out. Very happy with it.

    Homeowner, kitchen

  • “Cost plan we could trust”

    The cost plan broke every stage down so we knew what the extension would need before a single quote came in. No surprises at the final account.

    Homeowner, extension

  • “Tidy and well organised”

    The loft went in with the house still lived in. Dust sheets every day, the stairs finished before the steels were boxed in, and clear updates each Friday.

    Homeowner, loft conversion

  • “Thought about every detail”

    The wet room was planned around my mother’s wheelchair, from the door width to where the rails sit. She can use it on her own now.

    Family member, accessible bathroom

Renovating a house is mostly a question of order. The electrician needs the floorboards up before the carpenter lays new ones. The plasterer needs the first fix finished before skimming. The kitchen cannot go in until the walls have dried. When those trades are booked separately, the gaps between them are where time and money disappear. We run a home renovation as a single programme, with each trade arriving when the stage before it is signed off.

Most of the houses we work on in London were built before central heating, mains electrics or damp-proof courses were standard. Opening them up usually reveals something: a joist cut through for an old gas pipe, a lintel that is really a timber plate, a mix of lead and copper pipework. We allow for that in the survey and the quote, and we tell you promptly when something is found so decisions are made before work moves on.

For larger jobs, some clients want the budget checked independently at the start. A quantity surveyor can prepare a cost plan from the drawings before we price, which gives you a benchmark against which to judge the build. It is most useful while the scope is still moving, since each change to the drawings can be priced against the same plan and you see its effect on the total before deciding.

Complete House Renovations

A full house renovation takes the building back to its structure and brings it up to modern use. On a typical London terrace that means stripping out old finishes, then rebuilding services and surfaces floor by floor.

  • Full rewire with a new consumer unit, certified under Part P
  • New heating and hot water, often with the boiler moved
  • Replumbing, with any lead supply pipe replaced
  • Replastering or overboarding walls and ceilings
  • New floors, joinery, doors and skirting

In an empty house we can work across several floors at once. If you are living in it, we phase the work so there is always a usable bathroom and somewhere to sleep, with active areas sealed behind zipped dust screens.

When you renovate a wall, floor or roof, Part L can require its insulation to be improved where practical, so we build this into the specification from the start.

Full House Refurbishment

Refurbishment is lighter than renovation. The structure and most of the services stay, and the work is about renewing surfaces, fittings and finishes. It suits houses that have been maintained but look tired, rental properties between tenancies, and flats bought with dated interiors.

A full house refurbishment might include new flooring throughout, skimming over cracked or artexed ceilings, replacing internal doors and ironmongery, new sanitaryware on existing pipework, and full redecoration. We often add targeted repairs: easing sash windows and replacing cords, repointing a chimney stack, or treating a damp patch at the cause rather than painting over it.

The value of doing it as one job is coordination. The decorator comes in after the electrician has swapped the faceplates and the joiner has hung the doors, not before. Skirting is fitted after the flooring, not cut around it. That order is what makes a house look finished.

Design, Planning and Build

Most renovations sit inside permitted development or need no planning consent at all, since internal work is rarely a planning matter. Listed buildings need listed building consent for internal changes as well as external ones. Conservation areas can control windows, doors, roofs and front boundaries, and many inner boroughs use Article 4 directions to remove permitted development rights on terraces.

Building Regulations apply more widely. Rewiring, new heating, structural alterations, replacement windows and some insulation work all need to comply and, in most cases, to be signed off by building control or a registered competent person. We confirm which apply before work starts.

On the design side, we work from your architect’s or designer’s drawings where you have them. Where you do not, we can help you decide the scope with a room-by-room schedule of works, which becomes the basis for the quote and the programme.

Kitchen and Bathroom Renovations

Kitchens and bathrooms are the rooms where renovation costs gather, because they combine building work, plumbing, electrics, tiling and fitted items in one space. They are also the last rooms to finish.

We plan them early anyway. The position of a new kitchen sink or a relocated bathroom affects waste runs, which affects where floor joists are notched and where the soil stack connects. Deciding these late means lifting floors twice. So the layouts are fixed at the start, first-fix pipework goes in with the rest of the plumbing, and the fitted rooms follow once plastering and flooring are done.

Our kitchen installation work covers units, worktops and appliances. Bathrooms are handled the same way: tanking in wet zones, extractor fans to Part F, and tiling onto boards suited to the room, not bare plaster.

Steel reinforcement laid before a concrete pour

Structural and Internal Alterations

Opening a kitchen into a dining room, removing a chimney breast, moving a staircase, or splitting a large bedroom to add a bathroom are all common in London period houses.

Anything that affects the structure needs a structural engineer’s calculations and building control approval. Removing a load-bearing wall means a steel beam sitting on padstones, with temporary props and needles holding the masonry above while it goes in. Taking out a chimney breast needs the stack above supported with a gallows bracket or a steel. Where a wall is shared with a neighbour, the Party Wall etc. Act 1996 may require notice before work starts.

Non-structural changes are simpler but still need care. New stud partitions should include acoustic insulation between bedrooms. Fire doors may be needed where a layout change affects the escape route, particularly in houses of three or more storeys under Part B.

Project Management and Build Coordination

On a renovation, project management is less about paperwork and more about keeping trades moving in the right order. We run the programme, book the trades, order materials so they arrive when needed, and check each stage before the next begins.

You get a single point of contact who knows where the job stands. Typical things they handle:

  • Weekly updates on progress against the programme
  • Building control inspections booked at the right stages
  • Variations priced and agreed in writing before they are carried out
  • Long-lead items such as windows, stone worktops and joinery ordered early
  • Skips, licences and parking bays arranged with the council

Where you have a contract administrator or an architect running the job, we work to their instructions and under the contract you have chosen, such as a JCT form. Where you do not, we set out the scope, price, programme and payment stages in writing.

Renovation Costs, Timelines and Quoting

Renovation prices depend on a handful of drivers: the size of the house and how many floors are involved; how much of the structure and services are being replaced; the condition of what is found once walls and floors are opened; the specification of kitchens, bathrooms, flooring and joinery; access, parking and skip space on your street; and whether the house is occupied during the work.

Timelines follow the same drivers. A full renovation with structural changes, rewiring and new heating takes considerably longer, and a reliable programme can only be drawn up once the scope is fixed.

Our quotes are itemised by stage and by room, so you can adjust the specification line by line. We include a stated allowance for items that cannot be known until the building is opened up, such as rotten joists or hidden damp, rather than leaving them out.

Service Areas and Property Types

We take on house renovation and refurbishment work across London, and the type of property shapes the approach as much as the brief does.

Georgian and early Victorian houses have solid brick walls, lime mortar and often lath and plaster. They need breathable materials: lime plaster and mineral paints rather than gypsum and vinyl emulsion on damp-prone walls. Later Victorian and Edwardian terraces usually have a back addition, shallow foundations and suspended timber ground floors that benefit from insulation between the joists. 1930s semis tend to have cavity walls, larger gardens and simpler services to work with. Post-war and more recent flats bring leasehold consents, shared services and restrictions on working hours and noise.

The survey at the start tells us which of these categories your property falls into and what that means for the work.

How it works

How a renovation is run

Every renovation we take on moves through the same four stages, whatever its size.

  1. Plans and cost figures being reviewed at a desk

    Survey and scope

    We walk the property with you, lift a few boards, check the services and note the structure. From that we write a room-by-room schedule of works covering what stays, what goes and what needs building control.

  2. Bright finished interior after building work

    Itemised quote and programme

    The schedule becomes a priced quote broken down by stage and room, with a programme showing trade order and how long each phase takes. Allowances for unknowns are stated clearly, not hidden.

  3. House under construction with new block walls

    Strip-out and first fix

    Old finishes and services are removed, any structural work is carried out and inspected, then new wiring, pipework and heating are run. Building control checks happen here before walls are closed.

  4. London terraced houses with building work under way

    Finish and snag

    Plastering, flooring, joinery, kitchens and bathrooms, then decoration. We walk every room with you, list anything that needs attention, put it right, then hand over electrical certificates, appliance manuals and the building control completion certificate.

Quick Quote Online

Ready to plan your home renovation?

Send us the rooms, the rough scope and if you plan to stay in the house during the work, and we will prepare a Quick Quote.

Quick Quote Online

Areas covered

Renovating London’s houses and flats

Renovation work in London means dealing with every era of housing. Georgian and Victorian terraces in Islington often sit in conservation areas and need lime-based repairs and careful joinery. Holloway has plenty of Victorian houses split into flats, where each renovation involves leaseholder consents and shared services. Peckham’s terraces commonly need a full rewire, new heating and structural work to the back addition. Further out, 1930s semis in Harrow and Croydon offer more space and simpler construction, with refurbishments often centred on kitchens, bathrooms and insulation.

  • London
  • City of Westminster
  • Islington
  • Chelsea
  • Battersea
  • Holloway
  • Brixton
  • Peckham
  • Fulham
  • Archway
  • Shepherds Bush
  • Kilburn
  • Canary Wharf
  • Stamford Hill
  • Willesden
  • Cricklewood
  • Putney
  • Greenwich
  • Streatham
  • Stratford

Plus 61 more towns listed on the areas we cover page.

FAQ

Renovation & Refurbishment: questions people ask first

Renovation & Refurbishment
What is the difference between renovation and refurbishment?

Refurbishment renews finishes and fittings: flooring, decoration, doors, sanitaryware. Renovation goes deeper, replacing services, repairing structure and often changing the layout. Many projects are a mix, for example a full rewire and new heating with a cosmetic refurbishment of rooms that are already sound. We describe the scope in plain terms in the schedule of works.

Can I live in my house while it is renovated?

Often, yes, if the work is phased. We keep one bathroom and one area for sleeping usable, seal off active zones and clean down daily. Some stages, such as a full rewire or replacing the heating in winter, are much easier with the house empty, so for larger jobs many people move out for part or all of the programme.

What should be done first when renovating a house?

Structure and the building envelope come first: roof, gutters, damp and any structural repairs. Then services, meaning wiring, plumbing and heating, before any plastering. Finishes, kitchens, bathrooms and decoration come last. Doing it in any other order usually means undoing finished work to reach something underneath.

Does a house renovation need planning permission?

Internal work rarely does, unless the building is listed. External changes such as new windows, doors or roof alterations may need consent in conservation areas or where an Article 4 direction applies. Building Regulations apply more broadly, covering rewiring, heating, structural changes and insulation. We confirm which consents apply before starting.

How do you handle problems found once work starts?

We stop, show you what has been found, and explain the options with a price before carrying on. The quote includes stated allowances for likely unknowns such as rotten joists or hidden damp, so smaller surprises are already allowed for. Anything beyond that is priced as a written variation for you to approve first.

Quick Quote Online

Get a Quick Quote for your renovation

Tell us about the property, the rooms involved and the scope you have in mind. We will come back with an itemised Quick Quote and a suggested programme.

Excellent
  • A written price before any work starts
  • Cost planning and building from one team
  • London and the towns around it
info@hccconstruction.co.uk

Quick Quote Online

Secure form. Your details are only used to reply to your enquiry.

Quick Quote Online