Cost control for builds

Quantity Surveying in London for Residential Builds

Measured cost plans, priced schedules and site valuations that keep the money on a London building project visible from first sketch to final account.

Excellent
Quantity Surveying

Quantity Surveying

  • A written price before work starts
  • One team from plan to handover
  • Working across London

Clients value knowing where every line of the budget sits

Client reviews

Excellent
  • “Cost plan we could trust”

    The cost plan broke every stage down so we knew what the extension would need before a single quote came in. No surprises at the final account.

    Homeowner, extension

  • “Tidy and well organised”

    The loft went in with the house still lived in. Dust sheets every day, the stairs finished before the steels were boxed in, and clear updates each Friday.

    Homeowner, loft conversion

  • “Thought about every detail”

    The wet room was planned around my mother’s wheelchair, from the door width to where the rails sit. She can use it on her own now.

    Family member, accessible bathroom

  • “Clear valuations”

    Monthly valuations were measured properly and explained line by line. Having the numbers checked independently made the whole job calmer.

    Developer, refurbishment

  • “Straight answers”

    Every question about the basement got a straight answer, including the ones about party walls and drainage we had not thought to ask.

    Homeowner, basement

  • “Kitchen fitted properly”

    Units level, worktop joints you can barely see, and the old boxing moved so the extractor could run straight out. Very happy with it.

    Homeowner, kitchen

Most building budgets go wrong in the gap between a drawing and a price. A quantity surveyor closes that gap by measuring the work, pricing it line by line and then tracking every change once the builder is on site. Home Care Construction provides quantity surveying services to homeowners, landlords and small developers across London, on jobs ranging from a rear house extension to a new build on an infill plot.

The work is practical rather than academic. We read the architect’s drawings and the structural engineer’s calculations, count the steels and padstones, measure the brickwork and the plasterboard, and turn it all into a cost plan you can test decisions against. When the design changes, the numbers change with it, so you can see the effect of a bigger rooflight or a different floor finish before anyone orders materials.

On site, the same measured document becomes the basis for valuations, variations and the final account. That continuity matters. It means the figure agreed at the start can be traced to the figure paid at the end, with every addition and omission recorded along the way and nothing left to memory or a round-number invoice.

Quantity Surveying Services for London Homes and Developments

Quantity surveying covers the commercial side of a build: what it should cost, how the contract is let, what is paid as work progresses and how the account closes. On a residential job these tasks are often squeezed into the builder’s quote and a handshake, which is where most disagreements start. Separating them out gives the client a clear record and gives the builder a fair, measured basis for payment.

We work on the project types that make up most of London’s domestic building: side-return and rear extensions, loft conversions, basement excavation, whole-house refurbishments and small new-build schemes. Services can be taken as a full package from feasibility to final account, or picked individually at the stage where you need them.

  • Order of cost estimates at feasibility stage
  • Elemental cost plans as the design develops
  • Bills of quantities and priced schedules of works
  • Tender analysis and contract preparation
  • Interim valuations and variation pricing
  • Final accounts and support if a dispute arises

Cost Planning and Estimating

A cost plan should start before the planning drawings are finished. At feasibility stage we produce an order of cost estimate built up from floor areas and the known conditions of the site: a Victorian terrace on shallow brick footings in London clay, rear access only through the house, a party wall on each side. Facts like these move a budget far more than the choice of kitchen units.

As the design firms up, the estimate is rebuilt elementally, following the structure set out in RICS NRM1. Substructure, frame, upper floors, roof, external walls, windows and doors, finishes, services and preliminaries each get their own figure, so you can see which element is carrying the weight. Risk allowances and contingency sit as separate lines rather than being buried in rates.

  • Ground conditions, foundation depth and any need for underpinning
  • Structural steelwork and temporary works to support existing walls
  • Access, parking suspensions and skip or grab lorry arrangements
  • Party wall matters with neighbours on one or both sides
  • The specification of glazing, finishes and heating

Each driver is priced on its own, so a trade-off becomes a decision you make rather than a surprise you discover.

Tender and Procurement Support

Sending a set of drawings to several builders rarely produces comparable prices. One includes the steel, one carries it as a provisional sum, one leaves out the drainage. Tender support fixes that by giving every tenderer the same measured document to price.

We prepare a bill of quantities or a detailed schedule of works measured in line with NRM2, with preliminaries, provisional sums and client-supplied items clearly marked. Returned tenders are checked arithmetically, rates are compared line by line, and each tenderer’s qualifications and exclusions are listed so you can see exactly what the price does and does not cover. Where a rate looks too low to be sustainable, we flag it, because an underpriced line tends to come back later as a claim.

The procurement route matters too. A single-stage lump sum on full drawings suits most extensions and lofts. A two-stage approach, or a design and build arrangement, can suit a new build where the contractor’s view on buildability is useful early. We set out the practical effect of each route on price certainty and programme, then help assemble the contract documents once a price is accepted.

Contract Administration and Commercial Management

Once a price is agreed, the contract has to be written down properly. On residential work that usually means a JCT form matched to the size of the job: the Homeowner contract for straightforward domestic work, Minor Works for smaller projects with a contract administrator, or Intermediate for larger refurbishments and new builds. We help select the form, complete the contract particulars and attach the priced document, drawings and programme.

During the build, commercial management means keeping a running record. Instructions are issued in writing, variations are priced before they are carried out wherever possible, and a cost report shows the anticipated final cost against the approved budget. If the client asks for a wider opening, or the builder finds rotten joists under a bathroom floor, the cost lands on the report that week rather than months later at the final account.

  • Written instructions for every change to the scope
  • Variation pricing using contract rates where they apply
  • Regular cost reports against the approved budget
  • Tracking of provisional sums as they are firmed up
Timber roof joists going up on a house extension

Valuations and Interim Payments

On most jobs the builder is paid in stages, and interim valuations decide what each stage is worth. We visit site, measure what has actually been built, check materials delivered and value the work against the priced document. The result is a valuation both sides can check, rather than a request for a round sum because the roof is on.

Retention, where the contract provides for it, is deducted and tracked. Variations agreed since the last valuation are added at their agreed values, and disputed items are listed separately so they do not hold up payment for undisputed work.

The payment rules depend on who the client is. Contracts with a homeowner who lives, or intends to live, in the property are excluded from the statutory payment provisions of the Housing Grants, Construction and Regeneration Act 1996, so the contract itself must set out the timetable and mechanism. For landlords and developers the Act applies, and payment notices and pay less notices must be issued within the contract periods. We prepare those notices and keep the dates, because a missed notice can mean paying a sum you had good reason to question.

Final Accounts and Dispute Resolution

The final account brings together the contract sum, every variation, the adjustment of provisional sums, any agreed loss and expense, and the release of retention. When the cost reports have been kept up during the build, the final account is mostly a matter of checking and signing. When they have not, it becomes a reconstruction exercise from invoices, emails and recollection.

We prepare or review final accounts on projects we are running and on jobs where the records have fallen behind. Each item is traced back to an instruction and a measured quantity, and anything that cannot be supported is marked for discussion rather than simply paid.

If agreement is not reached, most residential disagreements settle at a meeting with the figures laid out clearly. Where that fails, the dispute clause in the contract sets the route, which may be mediation or, on contracts covered by the Construction Act, adjudication. We prepare the quantum side: measured schedules, valuations of disputed variations and a plain statement of what is owed and why. The aim throughout is a settled account that both parties can sign.

RICS Standards and Professional Practice in Quantity Surveying

Measurement only works if everyone measures the same way. Our quantity surveying follows the RICS New Rules of Measurement: NRM1 for order of cost estimates and elemental cost plans, and NRM2 for detailed measurement in bills of quantities and schedules of works. Working to a published standard means a tenderer, a lender’s monitoring surveyor or an incoming contractor can pick up the document and understand exactly how each quantity was taken.

Professional practice is also about how the work is handled day to day:

  • Assumptions and exclusions are written down, not left implied
  • Every quantity is traceable to a specific drawing and revision
  • Cost reports separate committed spend from risk allowances
  • Design changes are priced before they are instructed wherever possible

Where Home Care Construction is also the contractor on a job, the commercial records are kept to the same standard and shared openly with the client, so the measured basis of each payment can be checked at any stage of the build.

How it works

How our quantity surveying works

Four stages that follow the money on a residential build from first sketch to settled account.

  1. Tape measure pulled out across a room during a site visit

    Measure the drawings

    We take off quantities from the architectural and structural drawings, noting each revision. Gaps in the information, such as a missing drainage layout or unconfirmed steel sizes, are listed so they can be closed or carried as a priced risk.

  2. Builders working on a house under construction

    Build the cost plan

    Quantities are priced element by element to NRM1, with preliminaries, contingency and client-supplied items shown separately. You get a working document that is updated each time the design moves, so decisions are made with current figures.

  3. Calculator and printed drawings used to price building work

    Let the contract

    The measured schedule goes out for pricing, returns are checked line by line, and the agreed price is written into a suitable JCT contract with the drawings, programme and payment terms attached.

  4. Builder at work on a house

    Value and close out

    On site we carry out interim valuations, price variations and keep the cost report current. At completion, the final account is agreed against the same measured document used at the start of the project.

Quick Quote Online

Get a clear figure before the first brick moves

Tell us about the project and the stage it has reached, and we will send a Quick Quote for the surveying you need.

Quick Quote Online

Areas covered

Quantity surveying across London

London’s housing stock gives every cost plan a different starting point. A Georgian terrace in Islington may sit in a conservation area with timber sash windows that must be matched, while a 1930s semi in Harrow has room for a side extension and easier access for deliveries. Converted flats in Kilburn bring leaseholder consent and shared structure into the budget, and new-build plots in Greenwich often carry drainage and highway works that a domestic extension never sees. We price each of these conditions directly, from party wall awards to skip licences, so the cost plan reflects the actual street and building.

  • London
  • City of Westminster
  • Islington
  • Chelsea
  • Battersea
  • Holloway
  • Brixton
  • Peckham
  • Fulham
  • Archway
  • Shepherds Bush
  • Kilburn
  • Canary Wharf
  • Stamford Hill
  • Willesden
  • Cricklewood
  • Putney
  • Greenwich
  • Streatham
  • Stratford

Plus 61 more towns listed on the areas we cover page.

FAQ

Quantity Surveying: questions people ask first

Quantity Surveying
What does a quantity surveyor do on a house extension?

A quantity surveyor measures the work from the drawings, prices it into a cost plan, and then uses that document to compare tenders, value the work at each stage and price any changes. The result is a traceable budget, so you can see how the agreed price becomes the final figure without relying on round-number requests for payment.

Is a quantity surveyor worth it for a small residential project?

It depends on the size and risk of the job. For a simple single-room refurbishment, a clear schedule of works may be enough. Once a project involves structural steel, basement excavation, party walls or several trades at once, measured cost control usually pays its way by catching unpriced variations and disputed valuations early. We can scope a lighter service for smaller builds.

At what stage should I bring in a quantity surveyor?

As early as possible, ideally before planning drawings are finalised. An order of cost estimate at feasibility stage shows whether the brief matches the budget while the design is still easy to change. Coming in later still helps with tendering and valuations, but by then the decisions about size and specification that drive most of the cost are already fixed.

What is the difference between a bill of quantities and a schedule of works?

A bill of quantities measures each item of work to a set standard, such as NRM2, and gives the quantities for the builder to price. A schedule of works describes the tasks, often room by room or trade by trade, and leaves the builder to assess the quantities. Bills suit larger or more complex builds; schedules suit refurbishments where the scope is easy to see.

Can you check a builder’s quote I have already received?

Yes. We review the quote against the drawings, check the arithmetic, identify items that are missing or carried as provisional sums, and list the builder’s qualifications and exclusions. You end up with a clear picture of what the price covers and a short list of questions to settle with the builder before signing a contract.

Quick Quote Online

Get a Quick Quote for cost planning

Share the project type, the location and the current design stage, and we will reply with a Quick Quote for cost planning, tender support or valuations.

Excellent
  • A written price before any work starts
  • Cost planning and building from one team
  • London and the towns around it